Metal L2 Granite Network Upgrade Mainnet Release Alert

Aug 31, 2024

Important: This is a mandatory upgrade - Deadline: September 10

📢 Granite Network Upgrade Mainnet Release Alert:

op-node/v1.9.1 and op-geth/v1.101408.0

This is a mandatory upgrade for Metal L2 & OP Stack Mainnet Chain Nodes and to support the Granite hard fork.

Activation Date/Time: 1726070401 - Wed 11 Sep 2024 16:00:01 UTC

op-node: https://github.com/ethereum-optimism/optimism/releases/tag/v1.9.1

op-geth: https://github.com/ethereum-optimism/op-geth/releases/tag/v1.101408.0

All node operators must update their mainnet nodes by September 10 to be ready for the September 11 activation and avoid a chain split.

-- Chains in the Superchain Registry – OP Mainnet, Base, Metal L2, Mode, Zora, Lyra, Orderly, and Race – will activate automatically using the registry.

-- Chains not in the registry will need to set and coordinate their hardfork time. This can be timed to the OP Mainnet time (Aug 12, 1600 UTC).

-- All chains and operators should alert their node providers of the hardfork so they update in time and, if necessary, set the time manually.

The mainnet activation time is:

Wed 11 Sep 2024 16:00:01 UTC

Official Notice from Optimism: https://docs.optimism.io/builders/notices/granite-changes

Exchanges and operators can contact the Metal L2 team if you have any questions.

Metal L2 shapes the compliant future of finance, forging interoperability across the Metal ecosystem, from fiat on-ramps to Layer 1 and Layer 0 synergy.

© 2024 Metallicus, Inc. All rights reserved.

Metal L2 shapes the compliant future of finance, forging interoperability across the Metal ecosystem, from fiat on-ramps to Layer 1 and Layer 0 synergy.

© 2024 Metallicus, Inc. All rights reserved.

Metal L2 shapes the compliant future of finance, forging interoperability across the Metal ecosystem, from fiat on-ramps to Layer 1 and Layer 0 synergy.

© 2024 Metallicus, Inc. All rights reserved.